Monday, 16 November 2026 Subscribe

PM Surya Ghar: Muft Bijli Yojana (Rooftop Solar)

Central subsidy of up to Rs 78,000 for rooftop solar panels; a chance of up to 300 units of free electricity a month.

At a glance

Official name
PM Surya Ghar: Muft Bijli Yojana
Ministry
Ministry of New & Renewable Energy (MNRE)
Launched
13 February 2024
Target
Rooftop solar on 1 crore homes (outlay Rs 75,021 crore)
Central subsidy
1 kW: Rs 30,000; 2 kW: Rs 60,000; 3 kW or more: Rs 78,000 (maximum)
Official website
pmsuryaghar.gov.in
Official website

What is this scheme?

A scheme in which the Centre gives a direct subsidy to householders who install solar panels (rooftop solar) on their own roofs. Your own roof produces electricity for your home, and the surplus can be sold to the grid (net metering) to earn extra. Your electricity bill falls sharply, and in some homes drops to zero.

How much is the subsidy?

Solar system capacityCentral subsidy
1 kWRs 30,000
2 kWRs 60,000
3 kW or moreRs 78,000 (maximum limit)
  • Resident Welfare Associations / group housing societies: Rs 18,000 per kW for common facilities (3 kW per house, up to 500 kW).
  • Some states give an additional state subsidy; ask your state electricity company (DISCOM).
  • A 2-3 kW system is enough for a typical home and can generate up to about 300 units a month.

Who is eligible?

  • An Indian citizen with a house of their own and a suitable, unshaded roof.
  • A valid household electricity connection.
  • Must not have received any government subsidy for solar panels before.

How to apply (step by step)

  1. Register: at pmsuryaghar.gov.in choose “Apply for Rooftop Solar” and register with your state, DISCOM, electricity consumer number, mobile number and email.
  2. Apply: log in with your consumer number and apply for rooftop solar.
  3. Approval: the DISCOM gives technical approval (feasibility).
  4. Choose a vendor: choose only a vendor registered (empanelled) on the portal; the vendor installs the panels.
  5. Installation and net meter: after installation the DISCOM fits a net meter and inspects it.
  6. Commissioning report: get the report from the portal.
  7. Subsidy: submit bank details and a cancelled cheque on the portal. The subsidy is usually credited to your account in about 30 days.

Loan facility

  • For systems up to 3 kW, public sector banks give collateral-free loans at low interest (about 7%).
  • An option to apply for the loan is on the portal itself; the portal shows which banks offer it.

Cautions

  • Installing through a non-empanelled vendor means no subsidy.
  • Only panels meeting the quality standard (ALMM) should be used; ask your vendor whether he uses them.
  • Beware of anyone who collects money upfront saying “we will get your subsidy”.
  • Choose a capacity that matches your monthly consumption; excess capacity only adds cost.

Frequently asked questions

Can tenants join?

No. The house owner (the person with rights over the roof) must apply.

Is the electricity completely free?

"Free electricity" means your home's requirement is generated on your own roof; net metering reduces the bill or brings it to zero. Minimum fixed charges may apply.

How many years of maintenance?

Panels normally carry a 25-year performance warranty; the inverter less. See the maintenance terms in your agreement with the vendor.

Official sources and help

Rules, amounts and dates can change. Confirm the latest details on the official website or at the nearest office before applying. Never pay an agent: government scheme applications are free or carry only the official fee.

All schemes